Setting up and operating the monitoring center
In line with the programs developed to transform Mokranbar company into a smart company and the requirements set by the road organization regarding the issue of smartization, the monitoring center of Mokranbar company was exploited.
Monitoring room performance
The equipment of the monitoring room includes 3 complete computer systems and 3 large monitors, each system is connected to a monitor and has a separate task.
System number 1
This system is responsible for controlling the company’s trucks. A web application called CarMax is installed on this system which shows truck position, truck speed, average speed graph, live display of truck position, display, and number of trips.
System number 2
This system controls the waybills. A web application has been launched for this purpose. As soon as the driver of the company loads and registers the bill of lading, the full information of the bill of lading, including the date of the load, origin and destination, transportation company, number of the bill of lading, license plate, driver’s name, etc., will be displayed in this panel. Other features of this panel include reporting on the desired date and number statistics, and registration of drivers’ information including license, smart card, etc.
System number 3
This system is set up to announce the load. By having the information of the drivers, the user selects the load for them.
Other Links
-
8 Practical Ways to Reduce Transportation Logistics Costs
-
50 Tips for Truck Drivers – Second Part
-
Safety tips (fitness of the truck with the load)
-
What is the Difference Between a Semi-Truck and a Truck?
-
How to Prevent Cargo Damage on Long-Distance Routes?
-
Heavy vehicle engine maintenance tips
-
Buy Stocks by Mokranbar company
-
Convening of the first meeting of the province’s transport advisory commission
-
Best Practices for Loading Cargo in Trucks and Trailers
-
What Is Autonomous Trucking?
New Comment
All Comments
There are no comments about this post yet!